Build a new Köhlbrand Bridge
The SPD wants to replace the Köhlbrand Bridge with a new structure. The new bridge is to be taller so that large container ships can also reach the Altenwerder terminal.
The Köhlbrand Bridge in the port is old. The SPD wants to build a new bridge. It should be taller. Then big ships can pass under it.
According to the program, the review of the different options is complete. The clearance is to be about 70 meters. Heavy truck traffic is to be handled via the bridge so that it does not divert onto the Elbe islands and burden them.
Show the original quote (page 7)
„Wir werden eine neue Köhlbrandbrücke bauen. Sie wird mit einer Durchfahrtshöhe von rund 70 Metern künftig auch großen Containerschiffen ermöglichen, das Terminal Altenwerder anzulaufen“Translation: We will build a new Köhlbrand Bridge. With a clearance of about 70 meters, it will in the future also allow large container ships to call at the Altenwerder terminal
Placement
This point touches none of the axes.